Maintained EPNG - Window Rock, AZ
El Paso Natural Gas

El Paso Natural Gas Company

El Paso Natural Gas Company’s 50-year history with the Navajo Nation is one of cooperation, camaraderie, and mutual respect that El Paso looks forward to continuing for years. Since 1947, when then-El Paso President Paul Kayser developed plans to construct a 450-mile, 24-inch diameter natural gas pipeline that would transport San Juan Basin natural gas into southern California, El Paso has nurtured its relationship with the Nation. Construction plans called for about half the proposed pipeline to be built through the Nation to Topock, Arizona. El Paso worked with the Nation and individual tribe members to forge a longstanding, close relationship as the company’s representatives secured rights of way across Navajo lands. That relationship has been vital to providing much-needed natural gas supplies to the West Coast from the San Juan, Permian, and Anadarko basins as well as the Rocky Mountains.

Information about

EPNG

In October El Paso, donated a backhoe to the Bird Springs chapter. The back hoe will allow the community to maintain roads, repairs drainage, install utilities, and prepare burial sites

Window Rock, AZ Compressor Station

Company Name:
El Paso Natural Gas Company
Facility Name:

Window Rock, AZ Compressor Station
Location:
Window Rock, AZ
County:
Apache
AFS Plant ID:

04-001-N0611
Application Received:


Public Notice:
Public Notice (1pp, 38KB)
NNEPA Operating Permit Review:

Final Action:


General Source Information

Type of Facility:
Compressor Staion
General Description of Process/ Products:
Issuance of Title V Operating Permit Renewal
Standard Industrial Class (SIC): 


Permit Information

Permit Type:
Title V Operating Permit
Final Permit Information:

Type of Permit Action:
Permit
Decription of Proposed Modification:

This permit is for:

Entire Facility
Status:

Final
Applicable Requirements:



To view available PDF copy of Permit please see list Below.
Click HERE for a link to install Adober Reader (This is needed to read the PDF files)

Title V Permit (PDF) (44pp, 1.79MB)
Statement of Basis (PDF) (15pp, 140KB)
Responses to Comments (PDF) (13pp, 157KB)



 


Untitled Document